Over the past month (December) both Dad and Matt have done a LOT to the bathroom. As of today (January 5th) we are looking at buying two paint colors for the bathroom (Beige and a shade darker beige I think) and will paint the primer probably on Friday! So this is a LOT of progress over the past month- and more pictures will be updated as we finish the texturing and painting of the walls! Yey!!!
Once we paint, then Dad will instull the Shower/Bathtub enclosure. It is a wall enclosure with a tub to match it.
This is where our Shower/Bathtub enclosure will be located at.
This is the shelf we made that will be right next to the shower/bathtub.
No comments:
Post a Comment